Major Domestic and Global Achievements
-
2023 ~ 2024
- Jangsu County Pedestrian Bridge [2023]
- Hwacheon County, Gangwon Province Bridge Repair [2023]
- Design Incorporation for Defense Facilities (4 Projects) [2023~]
- Yangdeokwon Cathedral, Hongcheon, Gangwon Province [2024]
- Andong General Housing [2024]
- Super Architectural Modular Production and Exhibition (SC-Applied Reinforcement-Free Modular Construction) [2024]

-
2020 ~ 2022
- Bridge Design Incorporation (11 Cases) [2020~]
- Road Special Blocks (4 projects) [2020~]
- Application of Super Premixed Material Structures [2020~]
- Busan Eco Delta City Jangji-gan Pedestrian Bridge [2021]
- Architectural Interior/Exterior Finishes - Hyundai Department Store, Commercial Facilities, Residential Buildings, etc. (37+ projects) [2021~]
- Godeok Bridge (Han River Crossing Section of Guri-Anseong Expressway) (Godeok Topyeong Bridge) [2022]

-
2019
- Ala Wai Canal Bridge, Hawaii, USA (Design Incorporated) [2019]
- SUPER Concrete™ Chemical Admixture (Vietnam, Tezzenas Long Hau) [2019]
- Hakseoji Ecological Park Creation Project (Pedestrian Bridge) [2019]
- Gunwi County Subuk Bridge (Pedestrian Bridge) [2019]
- Danggye Bridge (Pedestrian Bridge Utilizing SC) [2019]

-
2017 ~ 2018
- Ulleungdo Healing Stay Cosmos Resort
- World's First UHPC Shell Reinforcement-Free Structure [2017] - Gangwon Province Chuncheon Legoland Access Bridge
- World's First UHPC Road Arch Bridge [2017] - Mui Bridge (Road Bridge) and Indeok Bridge (Road Bridge), Mu-eul-myeon, Gumi City [2017]
- Eunpyeong New Town Central Commercial District Plaza Construction (Pedestrian Bridge and Road Bridge) [2017]
- Gwangmyeong Cave VR Experience Center Construction [2018]
- Seoul National University Pavilion and Con-Slats (Support Structure) [2018]
- Extra Dose Bridge Tensioning Material Filler [2018]

- Ulleungdo Healing Stay Cosmos Resort
-
2013 ~ 2016
- Iowa State Bridge Construction, USA Hawkeye UHPC Bridge [2015]
- Geumo Stream Arch Bridge [2015]
- Myanmar Yangon-Mandalay Highway Expansion Project Ka-Rae-Myung Bridge [2015]
- Wonju Enterprise City Exit 1 & 2 Bridges (Road Bridges) [2016]
- Samsung-dong Hana Bank Wall Reinforcement [2016]
- KIST (Korea Institute of Science and Technology) 50th Anniversary Commemorative Monument [2016]

-
2009 ~ 2012
- SUPER Bridge I (World's First UHPC Pedestrian Cable-Stayed Bridge) [2009]
- Jobal Bridge (Design Implementation, World's First UHPC Road Cable-Stayed Bridge) [2011]
- Andong Bridge I (Korea's First UHPC Road Bridge) [2012]
- Andong Bridge II (UHPC Road Bridge) [2012]
- 5 Other Bridges [2012]

Application Fields
Architecture
Non-standard architecture, high-rise buildings, apartment/commercial building reconstruction, interior/exterior finishes (cladding/facades), parking buildings, logistics warehouses, modular/OSC, single/multi-family housing, resorts, cafes, etc.
Civil Engineering & Infrastructure
Bridges (cable-stayed, arch, suspension, etc.), road paving, blocks, curbs, noise barriers, TBM tunnel linings, pile foundations, retaining walls/slope reinforcement, railroad ties, hyperloop
Specialized Industry & Energy
Airport, port, marine structures, wind turbine towers, nuclear power plant containment buildings, special industrial facilities
Defense, protection, and special functions
Military facilities, blast/bulletproof concrete, vaults, and other high-performance concrete
Maintenance·Materials
Structural repair, strengthening and replacement work on bridge decks/girders/columns, substitution of steel/concrete/stone components, pre-mixed materials (60~180MPa)